PHASE 01
Scope and system categorisation
Inventory of assets and services, identification of information and service owners, assessment of the five security dimensions and determination of the system category under Annex I. This is where it is decided which measures and reinforcements will apply: the phase that drives the cost of all the others.
DeliverableCategorisation document, asset inventory and responsibility matrix.
PHASE 02
Risk analysis and Statement of Applicability
Risk analysis with a recognised methodology, identification of threats and safeguards, and a Statement of Applicability justifying, measure by measure of Annex II, its application, non-application or replacement by compensating measures. The real state of the platform is compared against the requirement and a gap analysis is issued with a status per measure.
DeliverableRisk analysis, Statement of Applicability and gap analysis (compliant / partial / non-compliant / not verified).
PHASE 03
Remediation plan and policy framework
Remediation plan prioritised by risk and effort, with execution sequence and owners. In parallel we draft the organisational framework documentation: security policy, acceptable-use standards, operating and incident-management procedures, and named role assignments.
DeliverableRemediation plan with a schedule and a policy framework ready for approval.
PHASE 04
Technical implementation on Azure and Microsoft 365
Execution of the plan on the real platform: identity and access control, email and browsing protection, encryption, activity logging, backups and continuity. Deployment is reproducible: first in simulation mode, then in report-only mode and only then in production.
DeliverableConfigured platform, deployment scripts, configuration export and change log.
PHASE 05
Evidence and audit preparation
Every implemented measure is documented with an evidence sheet: what the ENS requires, how it is solved, where it is verified and which capture or export proves it. We run an internal pre-audit with ENSAudit that reproduces the auditor’s script and close the findings before anyone outside sees them.
DeliverableEvidence dossier indexed by measure and internal pre-audit report.
PHASE 06
Certification audit and maintenance
Support throughout the certification body’s audit: handling evidence requests, documented technical responses to findings and a corrective action plan. Afterwards, conformity maintenance: periodic reviews, control of substantial changes and preparation for the biennial regular audit.
DeliverableSupport during the audit, corrective action plan and conformity maintenance schedule.